Coordinated Research Projects

Planned CRPs

Select programme: 

Agency Project
CRP Reference
Title
1.1.1.1 ID-1733  Coordinate a CRP on continued operations beyond 60 years in Nuclear Power Plants (new) (2010-2012) (partly unfunded) 
1.1.1.1 ID-1734  Coordinate a CRP on review and benchmark of calculation methods on piping wall thinning due to erosion-corrosion in nuclear power plants (new) (2010-2012) (partly unfunded) 
1.1.4.1 ID-1735  Coordinate a CRP on modelling and simulation for future innovative nuclear systems (extrabudgetary) 
1.1.4.1 ID-1736  Coordinate a CRP on R&D for innovative institutional approaches (extrabudgetary) 
1.1.5.2 ID-1737  Coordinate a CRP on integral PWR natural circulation flow stability and accident behaviour: international collaborative standard problem (ICSP) supported by experimental data (new) (2010-2012) 
1.1.5.2 ID-1787  Coordinate a CRP on Development of Methodologies for the Assessment of Passive Safety System Performance in Advanced Reactors (in cooperation with J.4.01, 1.1.5.4/9 and under the lead of 1.1.5.6/13) (I31018) (2008-2011) 
1.1.5.3 ID-1788  Coordinate a CRP on development of methodologies for the assessment of passive safety system performance in advanced reactors (under the lead of 1.1.5.6/29) (I31018) (2008 - 2011) 
1.1.5.3 ID-1738  Coordinate a CRP on the Source Term for Radioactivity Release Under Fast Reactor Core Disruptive Accident (CDA) Situations (new) (2010-2012) (partly unfunded) 
1.1.5.3 ID-1739  Coordinate a CRP on Optimum Plant Parameters for Metallic and MOX Fuelled Fast Reactors (new) (2011-2013) (partly unfunded) 
1.1.5.3 ID-1740  Coordinate a CRP on Thermal-hydraulics, Code Benchmarking and Handling of Liquid Metal and Molten Salt Coolants at High and Very High Temperatures (extrabudgetary) (new) (2010-2012) 
First Page     Previous Page     Next Page     Last Page  1/7

Go to the top Back to top