Coordinated Research Projects

Planned CRPs

Select programme: 

Agency Project
CRP Reference
Title
1.1.1.1 ID-1661  Coordinate a CRP on continued operations beyond 60 years in Nuclear Power Plants (new) (2010-2012) (partly unfunded) 
1.1.1.1 ID-1662  Coordinate a CRP on review and benchmark of calculation methods on piping wall thinning due to erosion-corrosion in nuclear power plants (new) (2010-2012) (partly unfunded) 
1.1.4.1 ID-1663  Coordinate a CRP on modelling and simulation for future innovative nuclear systems (extrabudgetary) 
1.1.4.1 ID-1664  Coordinate a CRP on R&D for innovative institutional approaches (extrabudgetary) 
1.1.5.2 ID-1665  Coordinate a CRP on integral PWR natural circulation flow stability and accident behaviour: international collaborative standard problem (ICSP) supported by experimental data (new) (2010-2012) 
1.1.5.3 ID-1666  Coordinate a CRP on the Source Term for Radioactivity Release Under Fast Reactor Core Disruptive Accident (CDA) Situations (new) (2010-2012) (partly unfunded) 
1.1.5.3 ID-1667  Coordinate a CRP on Optimum Plant Parameters for Metallic and MOX Fuelled Fast Reactors (new) (2011-2013) (partly unfunded) 
1.1.5.3 ID-1668  Coordinate a CRP on Thermal-hydraulics, Code Benchmarking and Handling of Liquid Metal and Molten Salt Coolants at High and Very High Temperatures (extrabudgetary) (new) (2010-2012) 
1.1.5.4 ID-1669  Coordinate a CRP on Graphite Irradiation Creep (new) (2010-2012) 
1.2.4.1 ID-1670  Coordinate a CRP on cladding and wrapper materials for sodium-cooled fast reactor (SFR) fuel assembly (2010-2013) / Ganguly / Inozemtsev 
First Page     Previous Page     Next Page     Last Page  1/7

Go to the top Back to top