Coordinated Research Projects
Notice Board, Approved CRPs
| CRP No. |
CRP Title |
Date of approval |
E13035 
|
Longitudinal Monitoring of Complicated Osteomyelitis by SPECT/CT   | 2008-05-29  |
E13036 
|
A Clinical CRP on New Generator Based Application for Oncology   | 2008-05-29  |
F41025 
|
Characterization of Size, Composition and Origins of Dust in Fusion Devices   | 2008-05-09  |
I32008 
|
Benchmarking Severe Accident Computer Codes for Heavy Water Reactor Applications   | 2008-05-09  |
I33012 
|
Control Rod Withdrawal and Sodium Natural Circulation Tests Performed during the PHENIX End-of-Life Experiments   | 2008-05-09  |
J71013 
|
Innovative Methods in Research Reactor Analysis: Benchmark against Experimental Data on Neutronics and Thermalhydraulic Computational Methods and Tools for Operation and Safety Analysis of Research Reactors. (Jointly conducted and equally funded with  | 2008-05-09  |
D23028 
|
Improving Nutritional Quality by Altering Concentrations of Enhancing Factors Using Induced Mutation and Biotechnology in Crops   | 2008-03-31  |
D24012 
|
Enhancing the Efficiency of Induced Mutagenesis through an Integrated Biotechnology Pipeline   | 2008-03-31  |
E43021 
|
Food Fortification and Biofortification to Improve Micronutrients Status During Early Life   | 2008-03-31  |
I31018 
|
Development of Methodologies for the Assessment of Passive Safety System Performance in Advanced Reactors   | 2008-03-17  |
T12022 
|
Improvement of Computer Codes Used for Fuel Behaviour Simulation FUMEX-III   | 2008-03-17  |
| D41022  | Increasing the Efficiency of Lepidoptera SIT by Enhanced Quality Control   | 2008-02-06  |
For information on any of the above CRP's please contact us.

E13035